Saturday, October 5, 2013
Generator Base
Just before I left for a week in Catalina with patrick's 8th grade class I got the base poured. I had to resist the temptation to strip the forms before I left--the concrete was still pretty green. You can see the sewer pipe elbows that will draw cool air in below the unit. I wrapped the inside of the forms with bubblewrap---the idea is walls with more surface area will absorb more sound than flat walls. We will see.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment