Last Minute Prep
So, a full load of concrete is 9.5 yards. I need 14.5 I figure for the foundation. The biggest expense is the delivery charge, so ordering a short load doesn't make sense.
So, I decided it was worth shaping and forming the rest of the driveway, enough to eat up another 4.5 yards. It's hard pan dirt and needs to come down about 8" in some spots. Racing the sun but got it done in time to get some rebar down.